Skip to content

chore: upgrade node types. #105

chore: upgrade node types.

chore: upgrade node types. #105

Triggered via push September 30, 2024 20:50
Status Failure
Total duration 1m 3s
Artifacts

ci.yml

on: push
Matrix: CI
Fit to window
Zoom out
Zoom in

Annotations

10 errors
CI (windows-latest, 22.9.0)
Process completed with exit code 1.
CI (windows-latest, 20.11.0)
The job was canceled because "windows-latest_22_9_0" failed.
CI (windows-latest, 20.11.0)
Process completed with exit code 1.
CI (macos-latest, 22.9.0)
The job was canceled because "windows-latest_22_9_0" failed.
CI (ubuntu-latest, 20.11.0)
The job was canceled because "windows-latest_22_9_0" failed.
CI (ubuntu-latest, 20.11.0)
The operation was canceled.
CI (macos-latest, 20.11.0)
The job was canceled because "windows-latest_22_9_0" failed.
CI (macos-latest, 20.11.0)
The operation was canceled.
CI (ubuntu-latest, 22.9.0)
The job was canceled because "windows-latest_22_9_0" failed.
CI (ubuntu-latest, 22.9.0)
The operation was canceled.