Skip to content

deps(dependabot): bump github.com/onsi/gomega from 1.34.2 to 1.35.1 #553

deps(dependabot): bump github.com/onsi/gomega from 1.34.2 to 1.35.1

deps(dependabot): bump github.com/onsi/gomega from 1.34.2 to 1.35.1 #553

Triggered via pull request November 4, 2024 07:16
Status Failure
Total duration 14s
Artifacts

pull-target-e2e.yml

on: pull_request_target
is-pr-approved
3s
is-pr-approved
wait-until-build-succeeds  /  Wait for build job
wait-until-build-succeeds / Wait for build job
backend-switching  /  backend-switching
backend-switching / backend-switching
Fit to window
Zoom out
Zoom in

Annotations

1 error
is-pr-approved
Process completed with exit code 1.