Skip to content

Bump execa from 6.1.0 to 9.5.1 #2291

Bump execa from 6.1.0 to 9.5.1

Bump execa from 6.1.0 to 9.5.1 #2291

Triggered via push October 29, 2024 16:30
Status Failure
Total duration 2m 46s
Artifacts

ci.yml

on: push
Checks ๐Ÿ“  /  Lint ๐Ÿ’…
27s
Checks ๐Ÿ“ / Lint ๐Ÿ’…
Checks ๐Ÿ“  /  Type check ๐Ÿงฎ
26s
Checks ๐Ÿ“ / Type check ๐Ÿงฎ
Checks ๐Ÿ“  /  Unit tests ๐Ÿงช
31s
Checks ๐Ÿ“ / Unit tests ๐Ÿงช
Matrix: Checks ๐Ÿ“ / End-to-end tests ๐Ÿ”ฌ
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Checks ๐Ÿ“ / Type check ๐Ÿงฎ
Process completed with exit code 2.
Checks ๐Ÿ“ / End-to-end tests ๐Ÿ”ฌ (1/3)
Process completed with exit code 1.
Checks ๐Ÿ“ / End-to-end tests ๐Ÿ”ฌ (3/3)
The job was canceled because "_1_3" failed.
Checks ๐Ÿ“ / End-to-end tests ๐Ÿ”ฌ (3/3)
The operation was canceled.
Checks ๐Ÿ“ / End-to-end tests ๐Ÿ”ฌ (2/3)
The job was canceled because "_1_3" failed.
Checks ๐Ÿ“ / End-to-end tests ๐Ÿ”ฌ (2/3)
The operation was canceled.