chore: bump com.guardsquare:proguard-gradle from 7.3.0 to 7.4.1 #3454
pull-request.yml
on: push
Instrumented Tests
30m 17s
Instrumented Orchestrator Tests
8m 27s
Unit Tests
4m 4s
Lint Checks
5m 19s
Kotlin Lint Checks
2m 58s
Kit Compatibility Test
0s
Security Lint Checks
/
Run Semgrep to find vulnerabilities and security antipatterns
0s
Security Lint Checks
/
Run mobsfscan to find Android/iOS vulnerabilities and misconfigurations
0s
Save PR Number for Dependabot Automerge
/
Save PR Number for Dependabot Automerge
Annotations
2 errors
Instrumented Tests
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 30 minutes.
|
Instrumented Tests
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
instrumented-orchestrator-tests-results
Expired
|
48 KB |
|
instrumented-tests-results
Expired
|
139 KB |
|
kotlin-lint-results
Expired
|
0 Bytes |
|
lint-results
Expired
|
726 KB |
|
unit-tests-results
Expired
|
453 KB |
|