Merge branch 'master' into drt-max-detour-constraint #7394
verify-push.yaml
on: push
Matrix: build
Matrix: verify-all-jobs-successful
Annotations
9 errors and 2 warnings
build (contribs/drt)
Process completed with exit code 1.
|
build (contribs/commercialTrafficApplications)
Process completed with exit code 1.
|
build (contribs/av)
Process completed with exit code 1.
|
build (contribs/integration)
Process completed with exit code 1.
|
build (contribs/drt-extensions)
Process completed with exit code 1.
|
build (contribs/simwrapper)
Process completed with exit code 1.
|
build (contribs/taxi)
Process completed with exit code 1.
|
build (contribs/vsp)
Process completed with exit code 1.
|
verify-all-jobs-successful (push-or-external-PR)
Process completed with exit code 1.
|
build (contribs/drt-extensions)
Failed to download action 'https://api.github.com/repos/dorny/paths-filter/tarball/4512585405083f25c027a35db413c2b3b9006d50'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
build (contribs/drt-extensions)
Back off 22.558 seconds before retry.
|