Increase timeout in gas-tank test #841
pipeline.yml
on: pull_request
Annotations
3 errors
build-image
Process completed with exit code 1.
|
deploy-check
The run was canceled by @afalaleev.
|
deploy-check
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Docker logs
Expired
|
772 KB |
|