Skip to content

test: clean up

test: clean up #365

Triggered via push October 18, 2023 19:31
Status Failure
Total duration 3m 16s
Artifacts

test.yml

on: push
Matrix: integration-tests
Matrix: sf-integration-tests
Matrix: unit-tests / linux-unit-tests / linux-unit-tests
Matrix: unit-tests / windows-unit-tests / windows-unit-tests
Fit to window
Zoom out
Zoom in

Annotations

12 errors
integration-tests (ubuntu-latest, test:integration:install)
Process completed with exit code 2.
unit-tests / linux-unit-tests / linux-unit-tests (latest)
Process completed with exit code 2.
integration-tests (windows-latest, test:integration:install)
The operation was canceled.
integration-tests (windows-latest, test:integration:link)
The operation was canceled.
integration-tests (ubuntu-latest, test:integration:link)
The job was canceled because "ubuntu-latest_test_integr" failed.
integration-tests (ubuntu-latest, test:integration:link)
The operation was canceled.
sf-integration-tests (ubuntu-latest)
Process completed with exit code 2.
unit-tests / linux-unit-tests / linux-unit-tests (lts/*)
Process completed with exit code 2.
sf-integration-tests (windows-latest)
The job was canceled because "ubuntu-latest" failed.
sf-integration-tests (windows-latest)
The operation was canceled.
unit-tests / windows-unit-tests / windows-unit-tests (latest)
Process completed with exit code 1.
unit-tests / windows-unit-tests / windows-unit-tests (lts/*)
Process completed with exit code 1.