Skip to content

Feature/add metrics (#137) #345

Feature/add metrics (#137)

Feature/add metrics (#137) #345

Triggered via push February 26, 2025 21:58
Status Failure
Total duration 50s
Artifacts

ci.yml

on: push
Matrix: build-linux
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build-linux (3.12)
Process completed with exit code 1.
build-linux (3.10)
The job was canceled because "_3_12" failed.
build-linux (3.10)
Process completed with exit code 1.
build-linux (3.13)
The job was canceled because "_3_12" failed.
build-linux (3.13)
The operation was canceled.
build-linux (3.11)
The job was canceled because "_3_12" failed.
build-linux (3.11)
Process completed with exit code 1.