Skip to content

build(deps): bump astral-sh/ruff-action from 1 to 2 #46

build(deps): bump astral-sh/ruff-action from 1 to 2

build(deps): bump astral-sh/ruff-action from 1 to 2 #46

Triggered via push November 25, 2024 18:01
Status Failure
Total duration 36s
Artifacts

build.yml

on: push
Matrix: test
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test (3.12, ubuntu-latest)
The process '/opt/hostedtoolcache/ruff/0.8.0/x86_64/ruff' failed with exit code 1
test (3.14, macos-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.13, macos-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.12, macos-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.14, windows-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.14, windows-latest)
The operation was canceled.
test (3.13, windows-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.13, windows-latest)
The operation was canceled.
test (3.13, ubuntu-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.13, ubuntu-latest)
The operation was canceled.
test (3.12, windows-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.12, windows-latest)
The operation was canceled.
test (3.14, ubuntu-latest)
The job was canceled because "_3_12_ubuntu-latest" failed.
test (3.14, ubuntu-latest)
The operation was canceled.