PB-8293 : Implement a new log writer which flushes the logs in every 30 seconds (for real time logs) #397
Travis CI / Travis CI - Pull Request
succeeded
Sep 19, 2024 in 35m 47s
Build Passed
The build passed, just like the previous build.
Details
This is a pull request build.
It is running a build against the merge commit, after merging #397 PB-8293 : Implement a new log writer which flushes the logs in every 30 seconds (for real time logs).
Any changes that have been made to the master branch before the build ran are also included.
Jobs and Stages
This build only has a single job.
You can use jobs to test against multiple versions of your runtime or dependencies, or to speed up your build.
Build Configuration
Build Option | Setting |
---|---|
Language | Go |
Operating System | Linux (Focal) |
Go Version | 1.21.11 |
Build Configuration
{
"language": "go",
"os": [
"linux"
],
"dist": "focal",
"sudo": true,
"env": [
"global={:GO111MODULE=>\"on\"}"
],
"go": [
"1.21.11"
],
"script": [
"if [ -n \"${TRAVIS_TAG}\" ]; then\n export RELEASE_VER=${TRAVIS_TAG}\nelif [ \"${TRAVIS_BRANCH}\" == \"master\" ]; then\n export DOCKER_IMAGE_TAG=master-latest\nelse\n export RELEASE_VER=`git rev-parse --short HEAD`\nfi\nmake all &&\nif [ \"${TRAVIS_PULL_REQUEST}\" == \"false\" ]; then\n docker login -u \"${DOCKER_USER}\" -p \"${DOCKER_PASS}\";\n make deploy;\nfi\n"
],
"notifications": {
"email": [
{
"on_success": "always",
"on_failure": "always"
}
]
},
"after_success": [
"go get github.com/mattn/goveralls",
"goveralls -coverprofile=coverage.txt -service=travis-pro -repotoken $COVERALLS_TOKEN"
]
}
Loading