Skip to content

Bump actions/setup-node from 3 to 4 #25

Bump actions/setup-node from 3 to 4

Bump actions/setup-node from 3 to 4 #25

Triggered via push October 23, 2023 17:53
Status Failure
Total duration 53s
Artifacts

ci.yml

on: push
Matrix: integration-test-elixir
Matrix: mix_test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
mix test (OTP 22.3 | Elixir 1.12.0)
Requested Erlang/OTP version (22.3) not found in version list (should you be using option 'version-type': 'strict'?)
mix test (OTP 24.3.4 | Elixir 1.14.0)
The job was canceled because "_1_12_0_22_3" failed.
mix test (OTP 24.3.4 | Elixir 1.14.0)
The operation was canceled.
integration-test-elixir (1.14.0, 24.3.4)
Process completed with exit code 1.