Skip to content

Merge pull request #125 from Arrowana/fix/triton-take-average-of-last… #62

Merge pull request #125 from Arrowana/fix/triton-take-average-of-last…

Merge pull request #125 from Arrowana/fix/triton-take-average-of-last… #62

Triggered via push August 9, 2024 15:36
Status Failure
Total duration 5m 14s
Artifacts

build.yml

on: push
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Build (ubuntu-latest, x86_64-unknown-linux-musl)
Process completed with exit code 101.
Build (windows-latest, x86_64-pc-windows-msvc)
The job was canceled because "ubuntu-latest_x86_64-un_2" failed.
Build (windows-latest, x86_64-pc-windows-msvc)
The operation was canceled.
Build (ubuntu-latest, x86_64-pc-windows-gnu)
The job was canceled because "ubuntu-latest_x86_64-un_2" failed.
Build (ubuntu-latest, x86_64-pc-windows-gnu)
The operation was canceled.
Build (ubuntu-latest, aarch64-unknown-linux-gnu)
The job was canceled because "ubuntu-latest_x86_64-un_2" failed.
Build (ubuntu-latest, aarch64-unknown-linux-gnu)
The operation was canceled.
Build (macos-latest, aarch64-apple-darwin)
The job was canceled because "ubuntu-latest_x86_64-un_2" failed.
Build (macos-latest, aarch64-apple-darwin)
The operation was canceled.
Build (macos-latest, x86_64-apple-darwin)
The job was canceled because "ubuntu-latest_x86_64-un_2" failed.
Build (macos-latest, x86_64-apple-darwin)
The operation was canceled.
Build (ubuntu-latest, x86_64-unknown-linux-gnu)
The job was canceled because "ubuntu-latest_x86_64-un_2" failed.
Build (ubuntu-latest, x86_64-unknown-linux-gnu)
The operation was canceled.