Automation v2.1: fixes and leftovers #32589
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
integration-tests.yml
on: pull_request
Check Paths That Require Tests To Run
14s
Get Solana Sha From Go Mod
8s
Matrix: build-chainlink
Matrix: eth-smoke-tests-matrix
Matrix: testnet-smoke-tests-matrix
Version Migration Tests
0s
Matrix: eth-smoke-tests-matrix-automation
Matrix: Post Live Testnet Smoke Test Results
ETH Smoke Tests Go Mod Cache
0s
Matrix: solana-smoke-tests
Annotations
3 errors
Build Chainlink Image (plugins)
buildx failed with: ERROR: failed to solve: golang:1.20-buster: failed to do request: Head "https://registry-1.docker.io/v2/library/golang/manifests/1.20-buster": net/http: TLS handshake timeout
|
Build Chainlink Image
The operation was canceled.
|
ETH Smoke Tests
Process completed with exit code 1.
|