Skip to content

chore(deps): update dependency husky to v9.1.6 #1404

chore(deps): update dependency husky to v9.1.6

chore(deps): update dependency husky to v9.1.6 #1404

Triggered via push October 23, 2024 19:28
Status Failure
Total duration 1m 10s
Artifacts

node-ci.yml

on: push
Matrix: verify-matrix
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

11 errors
verify-matrix (14.0.0)
Process completed with exit code 1.
verify-matrix (16)
The job was canceled because "_14_0_0" failed.
verify-matrix (16)
The operation was canceled.
verify-matrix (19)
The job was canceled because "_14_0_0" failed.
verify-matrix (19)
The operation was canceled.
verify-matrix (16.0.0)
The job was canceled because "_14_0_0" failed.
verify-matrix (16.0.0)
The operation was canceled.
verify-matrix (18)
The job was canceled because "_14_0_0" failed.
verify-matrix (18)
The operation was canceled.
verify-matrix (14)
The job was canceled because "_14_0_0" failed.
verify-matrix (14)
The operation was canceled.