LOYALIST-58 D10 migration step updates since launch #100
deployment-workflow.yaml
on: push
drupal
/
Set deployment image tag
7s
drupal
/
Notify Slack of Testing Start
2s
drupal
/
PHP Coding Standards
24s
drupal
/
Build Image
6h 0m
drupal
/
Update Docker Compose
4s
drupal
/
Set Newrelic Marker
0s
drupal
/
Execute, Check Cron Logs
0s
drupal
/
Check live configuration for changes post-update
0s
drupal
/
Notify Slack of Build Results
5s
Annotations
3 errors
drupal / PHP Coding Standards
Process completed with exit code 1.
|
drupal / Build Image
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
|
drupal / Build Image
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-image-tag
Expired
|
40 Bytes |
|
docker-compose
Expired
|
1.84 KB |
|