Skip to content

chore: Update NATS connection handling and error logging #19

chore: Update NATS connection handling and error logging

chore: Update NATS connection handling and error logging #19

Triggered via push September 14, 2024 05:37
Status Failure
Total duration 1m 27s
Billable time 6m
Artifacts 1

build-image.yaml

on: push
Matrix: Build Docker Image
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build Docker Image (coffee-maker/Dockerfile, coffee-maker, latest, coffee-maker)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c go build" did not complete successfully: exit code: 1
Build Docker Image (controller/Dockerfile, controller, latest, controller)
The job was canceled because "coffee-maker_Dockerfile_c" failed.
Build Docker Image (routes/Dockerfile, routes, latest, routes)
The job was canceled because "coffee-maker_Dockerfile_c" failed.
Build Docker Image (routes/Dockerfile, routes, latest, routes)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
une-tasse-de-cafe~coffee-shop~8LSRZK.dockerbuild
6.29 KB