Skip to content

build-and-test

build-and-test #206

Triggered via schedule February 24, 2024 00:53
Status Failure
Total duration 5m 57s
Artifacts

build-and-test.yaml

on: schedule
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 3 warnings
build-and-test (humble)
Docker login for 'ghcr.io' failed with exit code 1
build-and-test (humble, -cuda)
Docker pull failed with exit code 1
build-and-test (humble, -cuda)
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 0 MB
build-and-test (humble, -cuda)
Docker pull failed with exit code 1, back off 3.751 seconds before retry.
build-and-test (humble, -cuda)
Docker pull failed with exit code 1, back off 6.555 seconds before retry.