CI: Make sure all brew packages are upgraded #1103
extra-builds.yml
on: push
pre_job
5s
WASI build
12m 47s
Matrix: Build nix flake
Visual Studio build
11m 0s
Annotations
4 errors
WASI build
The run was canceled by @mmicko.
|
WASI build
The operation was canceled.
|
Build nix flake (ubuntu-latest)
The run was canceled by @mmicko.
|
Build nix flake (ubuntu-latest)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
vcxsrc
|
3.55 MB |
|