Feat(optimism): Optimism bridge #18
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
on-pull-request.yml
on: pull_request
Verify
/
Lint
7s
Matrix: Verify / Test
Annotations
7 errors
Verify / Test (2, 3, webSocket)
Process completed with exit code 1.
|
Verify / Test (3, 3, webSocket)
Process completed with exit code 1.
|
Verify / Lint
Process completed with exit code 1.
|
Verify / Test (2, 3, http)
Process completed with exit code 1.
|
Verify / Test (1, 3, http)
Process completed with exit code 1.
|
Verify / Test (1, 3, webSocket)
The operation was canceled.
|
Verify / Test (3, 3, http)
The operation was canceled.
|