Skip to content

test

test #913

Triggered via schedule November 28, 2023 00:14
Status Failure
Total duration 21m 10s
Artifacts 2

build_and_test.yml

on: schedule
Matrix: ubuntu-build-test
Matrix: windows-build-test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
ubuntu-build-test (1.1.x)
Process completed with exit code 2.
ubuntu-build-test (master)
The job was canceled because "_1_1_x" failed.
ubuntu-build-test (master)
Process completed with exit code 2.
windows-build-test (1.1.x)
Process completed with exit code 1.
windows-build-test (master)
The job was canceled because "_1_1_x" failed.
windows-build-test (master)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
colcon-logs-ubuntu Expired
4.61 MB
colcon-logs-windows Expired
3.28 MB